How much does it cost to Recharge Battery Electric Motor?
Electrical technology as drivers of vehicles are still relatively new in Indonesia. This is different to that in developed countries like the us, where cars and electric motor are already widely used as a means of personal transportation.
However, there are some companies who try their luck with bringing electric vehicles to the harga yamaha scorpio z limited edition ground water. One of them is Garansindo Technologies, which imports whole Zero Motorcycle from us.
Zero property of electric motors consisting of some type and capacity of battery. For type SR, available battery type lithium-ion with a capacity of maximum 12.5 kilo Watt hours (kWh) and 15.3 kWh.
The question arises, how long and how much you should be issued to recharge the battery?
If the calculated from the electric base rate (TDL) to 1,300 Watt capacity upward, the price harga yamaha jupiter z 2009 per kWh is around Rp 1,500. From the data specifications of the motor, the battery capacity that is obtained is of 11 kWh (Zero SR. 12.5 kWh).
In the data specifications are also listed a quantity of used electrical power to recharge the battery, i.e. 1,3 kW or 1300 Watts. If 11kWh divided by the number of 1.3 kWh, then would come by charging for a long time, i.e. about 8.5 hours.
For the cost, the price per kWh is multiplied by the length of time of charging, that is Rp 1,500 multiplied 8.5 hours, of which there was Rp 12.750.
With a capacity of 11 kWh battery, motor is able to traverse a distance of approximately 200 kilometres (km). That is, it only took Rp 12.750 to drove 200 km, or approximately Rp63 for each kilometernya.
As a comparison, Kawasaki Ninja 250 have a liter of fuel consumption for each 25 km. so to drove 200 km, necessary Builtin gasoline as much as eight liters.
If the price of Rp 9,000 per liter Builtin, so riders have to pay Rp 72,000 to reach a distance of 200 km, or about Rp360 for each kilometernya.